Fixing an issue related to a job should update control card

Scenario:
I do an inspection on a crane, and one or more of the checkpoints are RC or NC.
I file the inspection and create an inspection report.

Then I get the job to fix those issues. When those issues are fixed, I need to do a new inspection with checklist. I wish that fixing those issues would do something to the control report. Update it, or create a new one automatically.

1 Like

Thanks so much for sharing your idea! To move forward, we need more votes and input from other users. So for now, your idea is at the “In Discussion” stage.
If you know any colleagues who feel the same way, please encourage them to join the conversation and share their thoughts.